Synergy Power won Saigon Thuong Tin commercial joint stock bank – Tran Dang Ninh transaction office – Dong Do branch – Ha Noi project

Synergy Power won Saigon Thuong Tin commercial joint stock bank – Tran Dang Ninh transaction office – Dong Do branch – Ha Noi project

On 22/01/2019, Synergy Power signed contract supplying and installing standby generator for the project Saigon Thuong Tin commercial joint stock bank Tran Dang Ninh transaction office – Dong Do branch – Ha Noi.  

Project information:

  • Package: Standby diesel generator supply and installation.
  • Project: Saigon Thuong Tin commercial joint stock bank – Tran Dang Ninh transaction office – Dong Do branch – Ha Noi.
  • Address: Cluster 2, Dich Vong ward, Cau Giay district, Ha Noi.

Content provided:

  • Standby diesel generators supply and installation.
  • Type of contract: Package contract

Duration: 30 days from the effective date of the contract.