Synergy Power won Building water pumping station Project – Vsip Bac Ninh.

On Nov 9th 2016, Synergy Power signed Contract of  Supplying and Installing Standby Genset for Building water pumping station Project – Vsip Bac Ninh.

Project Information:

Bidding Package: Supplying and Installing Standby Generator

Project: Building water pumping station – Vsip Bac Ninh.         

Address: Vietnam-Singapore Industrial Park Bac Ninh

Providing Content: Supplying and Installing Genset of Standby Power

Contract Form: Package Contract

Leadtime: 70 days from the contract date